🚜 Groundworks RAMS Guidance

Groundworks RAMS Generator

Build a practical, audit-ready RAMS for groundworks works with structured controls, clear method steps, and downloadable output.

Last reviewed: 20 February 2026

Excavation and trench supportDrainage installationFoundations and concrete pours

Pre-Start Questions

  • Have all service drawings been verified on site?
  • What is the excavation inspection frequency and owner?
  • How are reversing and pedestrian routes segregated?

Evidence to Attach

  • Permit-to-dig and CAT/Genny records
  • Excavation inspection log
  • Temporary works details where required

Key Risks to Control

  • Strikes on buried services
  • Excavation collapse and edge failure
  • Plant/pedestrian interface incidents

Practical Controls

  • Permit-to-dig with service verification sequence
  • Trench support and exclusion setbacks
  • Traffic management and spotter controls for plant movement

Common Plant and Tools

Excavators and dumpersCompaction equipmentCAT/Genny and marking toolsShoring/trench box systems
FAQ

Groundworks RAMS — Frequently Asked Questions

They should define who authorises, verification steps, acceptable evidence, and stop-work triggers when conditions differ.
Support requirements depend on depth, ground conditions, and risk assessment, but RAMS must show decision logic and controls.
Define one-way systems, banksman responsibilities, exclusion zones, and communication protocols around blind spots.