Excavator Lift Plan Software (UK) — LOLER-compliant lifting plans
The Appointed Person builds the plan in Excel, photocopies duty charts from machine manuals, and emails a PDF that goes stale the moment the load or radius changes. On civils sites excavators lift every day — precast chambers, cover slabs, pipe runs, site huts — and LOLER 1998 Reg 8 requires every lifting operation to be properly planned by a competent person. When the client or HSE asks to see the plan, "it is on my laptop" is not an answer.
Answer 11 guided questions, load first. Site Samurai computes the safe working load at radius from a verified duty chart, applies accessory mode factors, shows spare capacity and categorises the lift basic, intermediate or complex. The Appointed Person authorises with card-validated sign-off, and a status-aware, org-branded PDF goes to the client — or as a secure read-only link — with REVnn history so the plan on site is always the plan that was approved.
How It Works
From the load on the lorry to the plan on site, the Lift Plan Builder takes the Appointed Person from first answer to issued document — with the capacity maths computed and traceable at every step.
- 1
Record the load first
Answer the questions that actually govern the lift: what is it, how much does it weigh, how is that weight known, where is the centre of gravity, are there designated lifting points, could it trap water, is it fragile or live? Weight-source factors (data plate, data sheet, drawing, volume × density) apply automatically. Only once the load is known does the wizard ask what will lift it — the sequence the SFPSG guidance and PUWER reg 4 suitability both require.
Step 1 of the lift plan wizard, "What are you lifting?" — a precast concrete chamber ring load of 600 kg with the data-plate weight factor selected, centre of gravity known and central, and dimensions 1.2 m by 1.2 m by 1 m recorded. - 2
Pick the machine — the engine computes the capacity
Select the excavator and its configuration. Site Samurai looks up the safe working load from the machine's verified duty chart at the radius and lift-point height, applies the accessory mode factors and the company factor of safety, and returns the gross load, planning load, allowable capacity, spare capacity and utilisation — every factor printed with its citation. No calculator, no transcribing numbers from a photocopied manual page.
The verified duty chart for a Kobelco SK140LC-11 object-handling configuration — a grid of over-front and over-side rated capacities at reach and height, marked VERIFIED and immutable, with the note that a blank cell means not rated at that position. - 3
Build the lifting team and validate the cards
Add the Appointed Person, lift supervisor, operator and slinger/signaller. The wizard snapshots each person's CPCS or NPORS card — scheme, grade, number, categories and expiry — and gates the plan on them: a red trained-grade card cannot act as Appointed Person, and the AP must attest each person's competence for the complexity of the lift.
The lifting team step of the wizard — the Appointed Person, lift supervisor, operator and slinger/signaller with their CPCS card details, card categories such as A61 and A62, and the Appointed Person competence attestation checkbox. - 4
Answer the method and environment questions
The wizard works through geometry, slinging, method and the site: radius and slew angle, accessories and their thorough-examination currency, pick and carry, tag lines, trial lift, ground bearing, exclusion zone, wind and overhead lines. The GS6 overhead-line questions capture the voltage band, isolation and the 10 m rule — and the answers drive the lift category and the printed controls.
- 5
The Appointed Person reviews and authorises
The AP reviews the complete plan — load and capacity, team, method, findings — and authorises with card-validated sign-off. Every authorisation is frozen as an immutable revision snapshot, so the plan the client holds is exactly the plan that was approved. A generic (standard) plan is permitted for basic lifts only; intermediate and complex lifts require the recorded AP appointment reference and attestations.
The AP authorisations and competence attestations page of an issued lift plan PDF — the Appointed Person, lift supervisor, operator and slinger/signaller each authorised by the Appointed Person with the date recorded. - 6
Issue the PDF — or share the secure client link
Issue the plan with a permit window and it becomes a status-aware, org-branded PDF — the cover carries the reference, revision, category and AP signature. Send it by email or mint a secure client link: no account needed, expires after 30 days, revocable at any time, and the client can only ever see the revision you issued.
The secure client view of an issued lift plan — Northfield Civil Engineering Ltd branded, marked Secure, showing LP-0001 REV 01 as an intermediate lift with the project, planned lift date, permit window and a download link for the lift plan PDF.
Features That Move The Needle
Built for high-stakes construction workflows: deadlines, compliance, and audit trails.
The 11 steps follow the order the guidance demands — the load first, then the equipment that lifts it. The AP is never asked to justify an excavator before anyone has said what is being lifted.
SWL at radius comes from the verified duty chart, not a spreadsheet formula. Gross load, planning load, allowable capacity, spare capacity and utilisation are computed once, the same way every time, and every factor prints with its citation.
Every chart is checked cell by cell against the operator's manual before any lift can use it — and once verified it cannot be edited, only superseded by a correction copy. The chart in the plan is the chart the machine was rated on.
Chains, slings, shackles, hooks and pins live in a register with their thorough-examination dates. The engine checks TE currency against the planned lift date before authorisation — an out-of-date sling stops the plan, not the lift.
The plan is signed by the Appointed Person named on it, gated on a valid CPCS A61 or NPORS card with scheme, number and expiry. A signature alone is not authority to sign a lift plan.
Every member's CPCS/NPORS card is snapshotted on the plan — grade, categories, expiry — with red-card gating and AP competence attestation. The plan carries the team as it was on the day.
The issued document carries your branding, the reference, REV number, category and the AP signature. A draft, authorised and issued plan print differently — and the revision history shows exactly what changed and why.
Clients and Principal Contractors view the plan in a branded, read-only page — no account, no app. Links expire and can be revoked, and the client can only ever see the revision you issued.
Anchored in the regulations that govern lifting on UK sites
Excavator lifting in the UK sits on LOLER 1998, its ACOP L113, BS 7121, and the CPA/SFPSG excavator-lifting guidance — with GS6 for overhead lines. Site Samurai is built around that framework: the plan records what Reg 8 requires, the capacity maths come from verified manufacturer duty charts, and the team and AP authorisation carry the card evidence. The platform captures and computes the evidence; it does not make the lift safe — that remains the Appointed Person's duty.
Regulation 8 requires every lifting operation to be properly planned by a competent person, appropriately supervised, and carried out in a safe manner. The product supports this with the load-first wizard, the recorded Appointed Person, the deterministic capacity engine and the issued plan document that stands as the record of the planning.
Regulation 8, LOLER 1998Regulation 9 covers the organisation of lifting operations — competent persons, supervision and safe systems of work — and, under reg 9(3), thorough examination of lifting equipment. The product records the lifting team and their cards, enforces thorough-examination currency against the planned lift date, and keeps the RoTE reference on every accessory, machine and quick hitch.
Regulation 9, LOLER 1998L113 is the HSE Approved Code of Practice for LOLER, giving practical guidance on what Reg 8 planning and Reg 9 organisation look like in practice. Site Samurai's plan record — load, machine, duty chart, team, method, controls and sign-off — is structured around what L113 expects a properly planned lifting operation to evidence.
L113 on HSEBS 7121 is the BSI code of practice for the safe use of cranes; its parts cover general practice, mobile cranes and the use of excavators as cranes, including the role of the Appointed Person and written appointment (BS 7121-1 4.2.2.1). The product's categories, AP appointment reference, lifting team and electronic records (permitted by BS 7121-3 10.3.2) follow that framework.
BS 7121 — BSIThe Construction Plant-hire Association and Strategic Forum for Plant Safety guidance for excavators used as cranes (CIG 0801) covers load-first planning, weight factors, pick and carry, slinging and team roles. The product's weight-source factors, pick-and-carry de-rating, tag-line controls and team attestations are aligned to that guidance.
CPA — excavator liftingGS6 is HSE guidance on working near overhead power lines: minimum distances by voltage band, isolation, and the 10 m rule for equipment and loads. The product's overhead-line step records the voltage band, envelope, isolation and proximity-warning-device answers, and the exclusion zone is built from the recorded distances.
GS6 on HSEWhy not just keep using Excel and the manual?
Most civils teams plan excavator lifts one of four ways before they land on something that fits. Here is what tends to break.
- Capacity maths typed by hand — a transposed number on a 5.0 m radius passes the chart
- Duty chart photocopies go stale the moment the machine or attachment changes
- No revision control — "LP_v7_FINAL_use-this-one.xlsx" is the audit trail
- No record of who checked what, when, or that the AP actually signed
- The plan lives on one laptop; the site cabin has last month's version
- Document workflows only — no capacity maths, no duty charts, no spare capacity
- The lift plan is a PDF attached to a task list, not a computed, signed document
- No Appointed Person workflow — authorisation is not card-validated
- No thorough-examination currency checks against the planned lift date
- A blank form to fill in — every number still typed by hand, every chart still photocopied
- No calculations, so the maths errors the engine exists to remove are all still there
- No sign-off workflow, no revision control, no audit trail
- No client links, no TE currency, and nothing gates on the team's cards
- Built for mobile cranes on major projects — machine-specific and priced accordingly
- Do not cover excavators used as cranes, which is what civils sites actually lift with
- A 3D model for a 600 kg chamber ring is the wrong tool for the job
- Enterprise onboarding and per-seat costs that punish an SME groundworks team
- Deterministic capacity engine — SWL at radius from the verified duty chart, never hand-typed
- Immutable duty-chart library verified cell by cell against the operator's manual
- Appointed Person workflow with card-validated authorisation and written appointment reference
- Lifting team with CPCS/NPORS cards, red-card gating and AP competence attestation
- Status-aware org-branded PDF, secure client link and REVnn revision history
Site Samurai is built in the UK around the Appointed Person's workflow. The load comes first, the engine computes the capacity from a verified duty chart with every factor printed, the team carries card evidence, and the AP signs with card-validated authorisation before a branded PDF or secure client link is issued. It captures and computes the evidence — the judgement on whether the lift is safe stays with the Appointed Person, exactly where LOLER Reg 8 puts it.
Why It Works
UK excavator lifting plans built around the Appointed Person's workflow. The 11-step wizard records the load first, the deterministic engine computes capacity from the verified duty chart — no manual maths, every factor printed — and the AP authorises with card-validated sign-off before an org-branded PDF or secure client link is issued, with REVnn history throughout.
Who It’s For
- If you're a civils or groundworks contractor lifting precast chambers, cover slabs, pipe runs and site huts with an excavator — every working day, on every job
- If you're a drainage, water or utilities contractor whose benchmark is sewage-treatment-works lifts — and the client asks for the plan before the machine starts
- If you're a lifting subcontractor or plant-hire firm whose excavators are used as cranes and need a plan that holds up when the Principal Contractor asks
- If you're the Appointed Person (CPCS A61 or the NPORS equivalent) who carries the planning duty under LOLER Reg 8 and wants the maths computed, not typed
- If you're the H&S manager keeping the register who needs the TE dates, card expiries and revision trail in one place when the inspector calls
- If you're the contracts manager who gets asked for lift plans at tender stage and wants to show the client a compliant, issued document
Already using Site Samurai? Jump to the module features and workflows your team needs.
Frequently Asked Questions
Common questions teams ask before they book a demo.
Related Resources
Lift plans, RAMS, toolbox talks, incidents and compliance in one place.
Generate CDM 2015-aware RAMS with AI or trade templates and digital sign-off.
Run talks digitally and keep sign-in records.
Capture incidents and investigations with audit trails.
Free RAMS templates, toolbox talk packs and CDM 2015 guides — including lifting operations.
Compare RAMS software options for UK construction teams.
Unlimited users across all plans.
Map your lifting workflow and approvals to the platform.
Ready To See It On Your Jobs?
Start a trial for hands-on access, or book a demo to map your workflow to the platform.
Prefer a walkthrough? Book a 15-min demo